Skip to content

Latest commit

 

History

History
183 lines (141 loc) · 7.5 KB

File metadata and controls

183 lines (141 loc) · 7.5 KB

Validation Checklist

Use this checklist before sending any client-facing deliverable. Mark unresolved items clearly. A design can be useful before every item is complete, but it must not be misrepresented as implementation-ready when critical unknowns remain.

Readiness Summary

Gate Yes/No Notes
Ready for concept review
Ready for implementation planning
Ready for installation

1. Intake Completeness

  • Client name and project type are recorded.
  • Client goals are documented in plain language.
  • Budget range or budget uncertainty is recorded.
  • Timeline is recorded.
  • Maintenance capacity is recorded.
  • Labor availability is recorded.
  • Aesthetic preferences are recorded.
  • Food, habitat, privacy, water, soil, access, and educational goals are recorded where relevant.
  • Non-negotiables, fears, and constraints are recorded.
  • Consent for photos, portfolio use, and documentation is recorded where relevant.

2. Base Map Readiness

  • Property boundary or working design boundary is shown.
  • Boundary confidence is stated.
  • North arrow is present.
  • Scale or measurement basis is stated.
  • Structures are shown.
  • Driveways, gates, paths, and access points are shown.
  • Major existing trees or vegetation areas are shown.
  • Water features and visible drainage areas are shown.
  • Utilities, septic, wells, easements, and hazards are shown or marked unknown.
  • Areas requiring field verification are clearly labeled.

Hard stop: Do not treat screenshots or hand sketches as survey-grade boundaries.

3. Site Analysis Completeness

  • Water movement is described.
  • Soil conditions are described or marked unknown.
  • Sun/shade patterns are described or marked unknown.
  • Slope/landform is described or marked unknown.
  • Wind/microclimate is described or marked unknown.
  • Existing vegetation is described.
  • Wildlife/pest pressure is described or marked unknown.
  • Human use patterns are described.
  • Access and maintenance routes are described.
  • Risks and opportunities are explicitly separated.

4. Water and Soil First Check

  • Water has been analyzed before final planting recommendations.
  • Overflow routes are considered for water interventions.
  • Soil testing or field soil assessment is recommended where needed.
  • Compaction and erosion are considered.
  • Mulch, organic matter, living roots, and soil cover are considered.
  • Planting zones match likely soil moisture and drainage.

Hard stop: Do not recommend earthworks as implementation-ready without checking utilities, overflow, slope risk, property impacts, and regulatory triggers.

5. Zone and Sector Logic

  • High-care elements are near frequent human activity.
  • Lower-care elements are placed farther away where appropriate.
  • Sun, wind, water, views, noise, privacy, wildlife, and access sectors are considered.
  • Zone placement matches client routines and maintenance reality.

6. Plant Selection Safety

  • Plant choices match sun/shade.
  • Plant choices match soil moisture and drainage.
  • Plant choices match hardiness and climate.
  • Deer/wildlife pressure is considered.
  • Mature size and spacing are considered.
  • Maintenance burden is realistic.
  • Edible/medicinal claims are cautious and verified.

7. Native / Invasive / Toxicity Review

  • Locally invasive species are avoided or flagged for verification.
  • Toxicity risks to children, pets, livestock, or clients are flagged.
  • Native species opportunities are considered.
  • Non-native species are justified by function and low risk.
  • Local extension, conservation district, native plant society, or government sources are used for uncertain plant risk claims.

Hard stop: Do not recommend potentially invasive or toxic plants without explicit caution and verification.

8. Climate Resilience Review

  • Drought resilience is considered.
  • Extreme rain and flooding are considered.
  • Wind exposure is considered.
  • Heat and reflected heat are considered.
  • Freeze-thaw and winter instability are considered where relevant.
  • Species diversity and redundancy are included.
  • Backup watering or establishment watering is addressed.

9. Maintenance Reality Review

  • Maintenance tasks are listed.
  • First-year watering is addressed.
  • Mulch and weed management are addressed.
  • Pruning or training needs are addressed where relevant.
  • Client labor capacity matches design complexity.
  • High-maintenance elements are either justified or simplified.

Hard stop: Do not deliver an installation plan without a maintenance plan.

10. Budget and Labor Reality Review

  • Materials are listed or estimated.
  • Labor phases are described.
  • DIY vs contractor tasks are separated.
  • Cost ranges are labeled as rough, estimate, quote, or actual.
  • Dependencies are identified.
  • First-year priorities are separated from optional upgrades.
  • Unsupported yield or profit claims are avoided.

Hard stop: Do not imply guaranteed profit, yield, savings, carbon credit, or grant outcomes without evidence.

11. Regulatory / Professional Review Triggers

Flag professional review if any are present:

  • Wetland, shoreline, stream, ditch, floodplain, or regulated waterbody work.
  • Large swales, ponds, dams, spillways, retaining walls, terraces, or slope stabilization.
  • Work near foundations, septic, wells, utilities, easements, driveways, culverts, or public roads.
  • Herbicide/pesticide recommendations.
  • Livestock, veterinary, food safety, or toxic plant concerns.
  • High-risk trees near people, buildings, roads, or utilities.
  • Legal, zoning, HOA, grant compliance, or permitting claims.

12. GraphML Model Integrity

  • All important graph nodes use allowed node types.
  • All important graph edges use allowed edge types.
  • Required node attributes are present.
  • Required edge attributes are present.
  • Confidence values are set.
  • Verification status is set.
  • Source type and source detail are included.
  • Unknowns are represented as nodes.
  • Critical risks are connected to affected design elements or tasks.
  • Versioned export is created after meaningful changes.

13. Decision Log Integrity

  • Major decisions have entries in DESIGN_DECISIONS.md.
  • Alternatives are recorded where meaningful.
  • Risks and unknowns are recorded.
  • Implementation implications are recorded.
  • Monitoring implications are recorded.
  • Graph updates are referenced.

14. Client Report Readiness

  • Executive summary is clear.
  • Client goals are restated accurately.
  • Design thesis is understandable.
  • Assumptions are visible.
  • Field-verification needs are visible.
  • Risks are not hidden.
  • Next steps are practical.
  • Tone is professional and client-ready.

15. Final Delivery Gate

Before delivery, confirm:

  • The design is labeled correctly as concept, master plan, implementation-ready, or monitoring update.
  • No unresolved hard stop is hidden.
  • The latest model version is exported.
  • PROJECT_STATE.md matches the deliverable.
  • CHANGELOG.md includes the latest meaningful changes.
  • Client-facing documents distinguish recommendations from verification needs.

Final Notes

A design may be ready for concept review even when it is not ready for installation. Never collapse those stages.