Skip to content
This repository has been archived by the owner on Apr 19, 2024. It is now read-only.

Latest commit

 

History

History

challenge-OT4-B1

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 
 
 
Challenge Title GTU Reward Seats Start Date Last Date for Submission
OT4-B1 Run a node for a month. 2500 GTU 750 20-01-2021 23:00 PT 03-03-2021 23:00 PT

Mission

  • Run a node for a month (30 full calendar days).

  • The 30 days count starts from 21-01-2021 at 08:00 CET, even if you started to run your node before that. Hence, if you have uninterrupted uptime, the challenge can earliest be completed on 20-02-2021 at 08:00 CET.

  • If your node is down for some periods, you must add the lost time afterwards. The summary log accumulates the uptimes of the node. It must show a runtime of at least 720 hours when submitting.

  • This challenge can be run concurrently with either challenge OT4-B2, OT-B3 or OT4-B4 or as a stand-alone challenge.

Submission

  • In submission.txt
    • Add your node ID
  • Upload your summary log (see Logs for instructions & tooling)
    • Runtime must show >= 720 hours.
    • Do not temper with or change anything in the log. Otherwise, we cannot guarantee acceptance.

Please follow the submission instructions thoroughly - your submission will not be accepted otherwise.