Skip to content

Latest commit

 

History

History
 
 

Assembly

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 

Assembling the Positron LT

Required tools:

  • Saw (aluminium & Steel)
  • Drill (aluminium)
  • Screwdriver
  • Soldering iron

Optional tools:

  • Tap

Preparation:

Cutting everything to length:

Makerbeams

You can find a cutting plan here

Required lengths:

  • 165mm x2
  • 200mm x2
  • 230mm x1
  • 240mm x2
  • 250mm x3
  • 30mm x1

Linear rails:

MGN9_RAIL (250mm): 227mm MGW9_RAIL (250mm): 227mm MGN12_RAIL (250mm): 225mm

Inserting inserts into the printed parts:

Images comming soon