Skip to content

Initial Docling support #206

Initial Docling support

Initial Docling support #206

Triggered via pull request May 4, 2026 19:03
@ppinchukppinchuk
synchronize #413
pp/docling
Status Cancelled
Total duration 1h 48m 24s
Artifacts

ci-python.yml

on: pull_request
Lint Python Code Base with Ruff
7s
Lint Python Code Base with Ruff
Pixi-Locked Test
2m 9s
Pixi-Locked Test
Matrix: Python Integration Tests (Pixi)
Matrix: Python tests (Tox)
Matrix: Python Unit Tests (Pixi)
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Python Integration Tests (Pixi) (ubuntu-latest)
The run was canceled by @ppinchuk.
Python tests (Tox) (ubuntu-latest, 3.12)
The run was canceled by @ppinchuk.
Python Unit Tests (Pixi) (ubuntu-latest)
The run was canceled by @ppinchuk.
Python Unit Tests (Pixi) (ubuntu-latest)
The operation was canceled.
Python checks
The run was canceled by @ppinchuk.