Skip to content

Latest commit

 

History

History
170 lines (120 loc) · 5.87 KB

File metadata and controls

170 lines (120 loc) · 5.87 KB

SIL Project Status

Last Updated: 2026-01-01 Architecture Version: 3.0 (Provenance-First)


⚠️ STRATEGIC CROSSROADS (January 2026)

CRITICAL: SIL faces a fundamental strategic tension that requires immediate founder review.

The Problem:

  • SIL's approach: "Building for decades" (10-20 year vision, Q1/Q2 2026 milestones)
  • AI reality: AGI estimates 2-7 years (exponential acceleration, $200B/year investment)
  • Question: Do these timelines make sense together?

Three Scenarios:

  1. Pre-AGI Sprint: Race to ship infrastructure before AGI (RADICAL acceleration needed)
  2. Pattern Documentation: Tools become obsolete, publish patterns/research instead
  3. Hedge Both: Fast critical work + parallel research (moderate risk)

Current pace (67% invariant enforcement, 30% Layer 1 complete) likely insufficient for Scenario 1.

Action Required:

  • Run tests (January-March 2026) - Progressive disclosure @ scale, regulatory requirements, hierarchical agency value
  • Make decision (End Q1 2026) - Choose Scenario 1, 2, or 3 based on test results
  • Execute - Commit fully to chosen path

Documents:

  • Full Assessment: /docs/meta/SIL_AGI_TIMELINE_STRATEGIC_ASSESSMENT.md (comprehensive analysis)
  • Quick Reference: /docs/meta/AGI_TIMELINE_QUICK_REFERENCE.md (decision framework)

Status: DRAFT - Awaiting founder review and decision

This is the most important strategic question SIL faces. All other work should be evaluated through this lens.


Recent Milestones ✅

December 20, 2025 — Architecture Decision Adopted

ADOPTED: Provenance-First model with Invariants Over Layers

Completed:

  • ✅ Fixed P0 blocker in SEMANTIC_OS_ARCHITECTURE.md
  • ✅ Created Architecture Decision Record (ADR)
  • ✅ Validated confidence assessment (85-90%)
  • ✅ Agent Ether implementation roadmap (16 weeks)
  • ✅ Documentation synced to sil-website

Evidence:

  • 6-session rigorous evaluation (Dec 14-20)
  • Provenance-First scored 4.15 vs 3.05 for Canonical
  • Perfect 1:1:1 mapping: THE_FORK → SCOPE_OF_HOPE → Invariants

Current Architecture

Provenance-First Layer Model

L6: Reflection       Learning from execution (Reveal)
L5: Execution        Deterministic computation (Morphogen)
L4: Composition      Cross-domain integration (Pantheon IR)
L3: Intent           Contracts and specifications (Agent Ether)
L2: Trust            Authorization (TAP)
L1: Meaning          Semantic understanding (Beth, Pantheon IR)
L0: Provenance       Cryptographic lineage (GenesisGraph)
───────────────────────────────────────────────────────────
L-1: Substrate       Physical foundation (Philbrick, optional)

Five Invariants (Mission Guarantees)

Invariant Prevents Enforcement Status
Everything has lineage Epistemic collapse GenesisGraph v0.3.0 ✅ Production
Reasoning is inspectable Black box dictatorship Reveal v0.25.0 ✅ Production
Computation is grounded Hallucinated science Morphogen v0.12.0 🟡 Prototype
Contracts are explicit Brittle complexity Agent Ether 0.1.0-alpha 🔴 Spec only
Efficiency is sustainable Compute as privilege Beth + Reveal ✅ Production

Overall Enforcement: 67% (3.5/5 production-ready)


Priority Work

🔴 Critical: Agent Ether Implementation

Status: Spec only (0 Python files) Priority: Highest (only invariant without tooling) Timeline: 16 weeks (Q1 2026)

Roadmap:

  • Phase 1: Registry + Metadata (4 weeks)
  • Phase 2: Contract Validation (4 weeks)
  • Phase 3: Runtime Enforcement (8 weeks)

Location: /projects/agent-ether/ROADMAP.md

🟡 Important: Morphogen v1.0

Status: v0.12.0 prototype (1,705 tests, 39 domains) Priority: High Timeline: Q2 2026 Goal: Production-distributed deterministic computation


Active Projects

Production Tools:

  • GenesisGraph v0.3.0 (provenance)
  • Reveal v0.25.0 (progressive disclosure)
  • Beth (semantic search, 14,549 files indexed)

In Development:

  • Morphogen v0.12.0 → v1.0
  • Agent Ether (spec → implementation)
  • Pantheon IR (type system maturation)

Infrastructure:

  • SIL Website (deployed, architecture docs updated)
  • SIF Website (deployed)
  • Infrastructure: 100% health (34/34 services)

Key Documents

Architecture:

  • /docs/foundations/SIL_SEMANTIC_OS_ARCHITECTURE.md (v3.0, updated 2025-12-20)
  • /docs/architecture/decisions/ARCHITECTURE_DECISION.md (ADR)
  • /docs/architecture/models/INVARIANTS_OVER_LAYERS.md
  • /docs/architecture/models/MODEL_EVALUATION.md (scoring: 4.15)

Mission:

  • /foundation/pitch/THE_FORK.md (five structural failures)
  • /foundation/SCOPE_OF_HOPE.md (five pillars)
  • /docs/foundations/SIL_GLOSSARY.md (canonical terminology)

Next Steps

📍 See /docs/ROADMAP.md for complete timeline and detailed breakdown

Immediate (Dec 20-27):

  • Approve consolidated roadmap (this replaces all prior planning docs)
  • Archive historical planning docs (pre-launch artifacts)
  • Commit Provenance-First architecture updates (uncommitted in SIL + sil-website)

Week 1-2 (Q1 2026 Start):

  • Implement Intent verification primitives (lib/pantheon/intent.py, 4-6 hours)
  • Assign Track 1 owner (Scott or hire FTE engineer)
  • Weekly progress updates to IMPLEMENTATION_STATUS.md

Q1 2026 (16 weeks):

  • Complete Track 1: Layer 1 Primitives (Intent, Uncertainty, Operators)
  • Complete Track 2: Agent Ether Phases 1-3 (Contract enforcement)
  • Achieve 80%+ invariant enforcement (4/5 production)

Mission: Building Timeline B (Glass Box future) instead of defaulting to Timeline A (Grey Fog)

Status: On track, architecture validated, known gaps documented with clear roadmap.