Skip to content

Run speakeasy run locally with version 0.42.7 (#321) #855

Run speakeasy run locally with version 0.42.7 (#321)

Run speakeasy run locally with version 0.42.7 (#321) #855

Triggered via push January 5, 2026 21:47
Status Failure
Total duration 20m 52s
Artifacts

ci.yaml

on: push
Matrix: test_contract
Matrix: test_integration
Matrix: test_unit
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test_integration (3.11)
Process completed with exit code 2.
test_integration (3.12)
The strategy configuration was canceled because "test_integration._3_11" failed
test_integration (3.12)
The operation was canceled.
test_integration (3.10)
The strategy configuration was canceled because "test_integration._3_11" failed
test_integration (3.10)
The operation was canceled.