fix(server): cancel and await producer task before cleanup to prevent GC warning (Fixes #1121) #3821
Annotations
11 errors
|
Test with Python 3.14
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test with Python 3.14
The operation was canceled.
|
|
Test with Python 3.14
Event loop is closed
|
|
Test with Python 3.12
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test with Python 3.12
The operation was canceled.
|
|
Test with Python 3.10
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test with Python 3.10
The operation was canceled.
|
|
Test with Python 3.11
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test with Python 3.11
The operation was canceled.
|
|
Test with Python 3.13
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test with Python 3.13
The operation was canceled.
|