You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit 35fd6c3
Browse filesBrowse the repository at this point in the historyBrowse files
Add lockstep release pre-flight and a release dry-run CI job
PDR-091b requires core, core-android, device and server to release
together on one version, with partial release impossible:
- A verifyReleaseArtifacts task asserts the exact published artifact
set, group and lockstep VERSION_NAME (catching module-local
overrides), failing before anything is uploaded. The release workflow
runs it ahead of publishAndReleaseToMavenCentral.
- A release-dry-run job in check.yml runs the pre-flight plus
publishToMavenLocal on every PR, so coordinate and version
regressions surface continuously rather than on release day.
- README gains a note describing the in-development 2.0 artifact set
and that 1.x installation instructions still apply.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
0 commit comments