Skip to content

289 include unrealized gains in backtesting result (#292) #886

289 include unrealized gains in backtesting result (#292)

289 include unrealized gains in backtesting result (#292) #886

Triggered via push January 26, 2025 10:44
Status Failure
Total duration 3m 19s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 2 warnings
test (macos-latest, 3.9)
Process completed with exit code 1.
test (ubuntu-latest, 3.9)
The job was canceled because "macos-latest_3_9" failed.
test (ubuntu-latest, 3.9)
The operation was canceled.
test (macos-latest, 3.11)
The job was canceled because "macos-latest_3_9" failed.
test (macos-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.11)
The job was canceled because "macos-latest_3_9" failed.
test (ubuntu-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.10)
The job was canceled because "macos-latest_3_9" failed.
test (ubuntu-latest, 3.10)
The operation was canceled.
test (macos-latest, 3.10)
The job was canceled because "macos-latest_3_9" failed.
test (macos-latest, 3.10)
The operation was canceled.
linting
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
linting
The `python-version` input is not set. The version of Python currently in `PATH` will be used.