Skip to content

Merge pull request #7 from ev-br/copilot/fix-complex-special-case-par… #268

Merge pull request #7 from ev-br/copilot/fix-complex-special-case-par…

Merge pull request #7 from ev-br/copilot/fix-complex-special-case-par… #268

Triggered via push January 15, 2026 22:42
Status Failure
Total duration 1m 12s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.14)
Process completed with exit code 1.
build (3.13)
The strategy configuration was canceled because "build._3_14" failed
build (3.13)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_14" failed
build (3.10)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_14" failed
build (3.12)
Process completed with exit code 1.