Skip to content

todo.

todo. #5

Triggered via push October 17, 2025 04:56
Status Failure
Total duration 18s
Artifacts

ci.yml

on: push
Matrix: test
build
build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.10)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
Process completed with exit code 1.
test (3.9)
The strategy configuration was canceled because "test._3_10" failed
test (3.9)
Process completed with exit code 1.
test (3.8)
The strategy configuration was canceled because "test._3_10" failed
test (3.8)
The operation was canceled.