You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I am evaluating different ACE approaches with MusOOEvaluator and mir_eval.chords. I wonder which total duration are you using in MusOOEvaluator to compute accuracy with WCSR.
I have seen in output file generated a field named Duration of evaluated chords (2624.32 s) that is different to the total duration of estimations (923.777 s). I have realized this Duration of evaluated chords is the sum of Correct, Substituted, Deleted, Inserted and Correct no-chords. Might you tell me why evaluated chord duration is longer than the total duration of estimations? And which total duration is using the evaluator to compute WCSR?
Thanks in advance!
The text was updated successfully, but these errors were encountered:
Hi @jpauwels
I am evaluating different ACE approaches with
MusOOEvaluator
andmir_eval.chords
. I wonder which total duration are you using inMusOOEvaluator
to compute accuracy with WCSR.I have seen in output file generated a field named
Duration of evaluated chords
(2624.32 s) that is different to the total duration of estimations (923.777 s). I have realized thisDuration of evaluated chords
is the sum ofCorrect
,Substituted
,Deleted
,Inserted
andCorrect no-chords
. Might you tell me why evaluated chord duration is longer than the total duration of estimations? And which total duration is using the evaluator to compute WCSR?Thanks in advance!
The text was updated successfully, but these errors were encountered: