You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Upon ACI Sync failure and changes applied should be undone.
Observed Behavior
ACI sync jobs that fail after making changes leave artifacts behind. This can cause unexpected behavior on subsequent syncs.
Steps to Reproduce
Configure Nautobot and ACI SSoT
Setup a failure scenario by creating an object that will exist in the ACI fabric but do not apply the configured ACI tag to the object
Run the sync job, the job will make many changes to the system, then encounter the error and halt. The changes will remain in the system.
The text was updated successfully, but these errors were encountered:
kingfetty
changed the title
ACI SSoT Sync is not transactional, failures are not rolled back.
ACI SSoT Sync is not atomic, failures are not rolled back.
Jan 17, 2025
Environment
Expected Behavior
Upon ACI Sync failure and changes applied should be undone.
Observed Behavior
ACI sync jobs that fail after making changes leave artifacts behind. This can cause unexpected behavior on subsequent syncs.
Steps to Reproduce
The text was updated successfully, but these errors were encountered: