Skip to content

Latest commit

 

History

History
126 lines (52 loc) · 6.69 KB

rewardsystem.md

File metadata and controls

126 lines (52 loc) · 6.69 KB

Peripherals part 3: Construction of the rewarding system

We will fix here a linear actuator that will bring the reward to the animal. The reward itself is delivered with two solenoid valves.

A buzzer is added to the system but do not need to be fixed to the table.

{{BOM}}

Additional framework {pagestep}

The following elements will be placed on the air table struts opposite of the pressure relief valve.

Image for tasks of step 1

Platform borders {pagestep}

Fixing the linear actuator {pagestep}

  • Place two SmallRig super clamp{Qty:2} at both ends of the SmallRig articulated_arm{Qty:1}.

  • Use one SmallRig super clamp to place the moving arm at one of the vertical strut profiles above the table, which side is up to you.

  • Place the linear actuator{Qty:1} in the SmallRig Super Clamp close to the center end of the not moving part.

    • In the case you didn't attach the 3D prints at the front of the linear actuator, the front hole in the linear actuator needs to point upwards.
  • Move the articulated arm and linear actuator to have the linear actuator orientated along the long side and centered. The moveable end needs to point towards the pressure relief valve. The super clamp should be around 10 cm above the table and 5 cm from the short airtable edge. The linear actuator should point around 30° downwards.

Pictures of the linear actuator placed with the SmallRig moveable arm

Fixing the solenoid pinch valve {pagestep}

Place one solenoid pinch valve{Qty:2} at the top of the vertical aluminium strut profile.

Tube placement {pagestep}

Finally you need to path the tubing from you source of reward through the solenoid pinch valve to the needle at the linear actuator front.

  • Use some cable ties{Qty:many} to guide the tube{Qty:1} to the needle.

    • Keep enough margin for maneuver for the tube as the linear actuator is moving.
    • Don't pull the cable ties tight as liquid needs to flow through.