Scrum Report (Sprint 2) | From 24/11/2021 to 30/11/2021 Team 6 NPM Name 140810200002 Rommel Malik Kusnadi 140810200022 Osmond Haylim 140810200024 Jonathan Victor Goklas Sprint Overview Planned (n) Completed (n) 6 7 Sprint 2 Backlog ID Title/Desc Asignee Status 1.2 Buat Board Snek Osmond DONE 1.3 Buat object Snek Osmond DONE 1.4 Buat logika Snek Osmond DONE 2.1 Buat objek fuud Rommel DONE 2.2 Buat logika fuud Rommel DONE 2.3 Buat input jalan Snek Jonathan DONE 3.1 Buat Sistem skor Jonathan DONE Retrospective Sprint kurang efektif karena javaFX tidak berjalan dengan baik di beberapa laptop. Next Sprint Backlog (Sprint 3) ID Title/Desc Asignee 3.2 Buat instruksi main Rommel 3.3 Buat Liderbord Osmond 3.4 Buat Main Menu Jonathan