| title | Integrate with TestRail | |||||||
|---|---|---|---|---|---|---|---|---|
| description | Sync QA Wolf automated test results to TestRail, including pass/fail status and run metadata for each test run. | |||||||
| sidebarTitle | TestRail | |||||||
| keywords |
|
For each QA Wolf run, the integration can:
- Create a new test run in TestRail.
- Sync automated test results (passed, failed, skipped).
- Include run metadata (name, run/bug link).
- Mark the test run as completed after results are synced.
Results are synced after runs reach Completed status in QA Wolf.
- Only one TestRail project can be configured per QA Wolf workspace.
- Test runs are created at the run level, with no test plan–level updates.
- The Skipped test status must exist in TestRail.
- Active TestRail account
- API access enabled, which requires a TestRail Administrator
If runs don't appear as expected, contact your QA Wolf representative.