Skip to content

Latest commit

 

History

History
238 lines (199 loc) · 6.81 KB

SPRINT_PLAN.md

File metadata and controls

238 lines (199 loc) · 6.81 KB

Sprint Plan - Writer's Block Assistant

Overview

  • Sprint Duration: 2 weeks
  • Story Points: Using Fibonacci (1, 2, 3, 5, 8, 13)
  • Initial Timeline: 6 months (12 sprints)
  • Team Composition: Backend, Frontend, DevOps, ML Engineers

Sprint Breakdown

Foundation Phase (Sprints 1-3)

Sprint 1: Core Infrastructure Setup

Theme: Basic Service Architecture

  • Setup project structure and CI/CD pipeline (5)
  • Initialize FastAPI project with dependency injection (3)
  • Setup PostgreSQL with pgvector extension (5)
  • Implement basic health checks and monitoring (2)
  • Create initial Docker configuration (3)
  • Setup development environment documentation (2)

Acceptance Criteria:

  • Services can be spun up locally with Docker
  • Basic API endpoints respond correctly
  • PostgreSQL with pgvector is operational
  • CI pipeline passes basic tests

Sprint 2: Multi-tenancy & RBAC

Theme: Security Foundation

  • Implement tenant management system (8)
  • Create user authentication service (5)
  • Develop RBAC framework (8)
  • Setup row-level security in PostgreSQL (5)
  • Implement basic audit logging (3)
  • Create tenant isolation tests (3)

Acceptance Criteria:

  • Multi-tenant data isolation works
  • Users can authenticate
  • Basic RBAC controls access
  • Audit logs capture key events

Sprint 3: Content Foundation

Theme: Basic Content Management

  • Implement content model and migrations (5)
  • Create content versioning system (8)
  • Setup basic content API endpoints (5)
  • Implement content search functionality (5)
  • Add content validation and sanitization (3)
  • Create content management tests (3)

Acceptance Criteria:

  • Content can be created and versioned
  • Basic search works
  • Content validation prevents invalid data
  • All tests pass

AI Integration Phase (Sprints 4-6)

Sprint 4: Ollama Integration

Theme: Local Model Setup

  • Setup Ollama service integration (8)
  • Implement model management system (8)
  • Create prompt engineering framework (5)
  • Setup model response handling (5)
  • Implement basic error handling (3)
  • Create model integration tests (3)

Acceptance Criteria:

  • Ollama models can be loaded and used
  • Prompts work correctly
  • Error handling is robust
  • Integration tests pass

Sprint 5: Vector Storage & RAG

Theme: AI Infrastructure

  • Implement vector storage system (8)
  • Create embedding generation pipeline (8)
  • Setup RAG query system (8)
  • Implement vector similarity search (5)
  • Create performance optimization tests (3)

Acceptance Criteria:

  • Vectors are stored correctly
  • RAG queries return relevant results
  • Search performance meets benchmarks

Sprint 6: Style Profiles

Theme: Personalization

  • Implement style profile system (8)
  • Create style vector generation (8)
  • Setup style matching algorithm (5)
  • Implement style adaptation system (8)
  • Create style profile tests (3)

Acceptance Criteria:

  • Style profiles can be created and stored
  • Style matching works accurately
  • Adaptation system produces consistent results

UI Integration Phase (Sprints 7-9)

Sprint 7: VSCode Extension Base

Theme: IDE Integration

  • Setup VSCode extension project (5)
  • Implement basic extension UI (8)
  • Create service communication layer (5)
  • Setup authentication flow (5)
  • Implement basic error handling (3)
  • Create extension tests (3)

Acceptance Criteria:

  • Extension installs and runs
  • Basic UI elements work
  • Service communication is stable
  • Authentication works

Sprint 8: Content Editing Features

Theme: Core Functionality

  • Implement content editor integration (8)
  • Create real-time content updates (8)
  • Setup content versioning UI (5)
  • Implement content search UI (5)
  • Create user feedback system (3)

Acceptance Criteria:

  • Editor integration works smoothly
  • Real-time updates are stable
  • Search UI is responsive
  • Version control is intuitive

Sprint 9: AI Features Integration

Theme: AI User Experience

  • Implement AI assistance UI (8)
  • Create style profile management UI (5)
  • Setup RAG query interface (5)
  • Implement progress indicators (3)
  • Create AI feature tests (3)

Acceptance Criteria:

  • AI features are accessible
  • Style profiles can be managed
  • RAG queries work from UI
  • Progress indicators are accurate

Knowledge Integration Phase (Sprints 10-12)

Sprint 10: Obsidian Integration

Theme: Knowledge Base Connection

  • Setup Obsidian vault integration (8)
  • Implement markdown processing (5)
  • Create knowledge graph extraction (8)
  • Setup bi-directional sync (8)
  • Create integration tests (3)

Acceptance Criteria:

  • Obsidian integration works
  • Markdown processing is accurate
  • Knowledge graph builds correctly
  • Sync works reliably

Sprint 11: Knowledge Graph Features

Theme: Knowledge Management

  • Implement knowledge node system (8)
  • Create relationship management (8)
  • Setup graph visualization (5)
  • Implement graph search (5)
  • Create graph analysis tools (5)

Acceptance Criteria:

  • Knowledge nodes can be created
  • Relationships work correctly
  • Visualization is useful
  • Search works efficiently

Sprint 12: Final Integration & Polish

Theme: System Integration

  • Implement final UI polish (5)
  • Create comprehensive documentation (8)
  • Setup usage analytics (5)
  • Implement feedback collection (3)
  • Create final integration tests (5)
  • Performance optimization (8)

Acceptance Criteria:

  • All systems work together
  • Documentation is complete
  • Analytics provide insights
  • Performance meets targets

Risk Mitigation

Technical Risks

  1. Vector Database Performance

    • Early performance testing
    • Implement caching strategy
    • Monitor query patterns
  2. AI Model Integration

    • Regular Ollama version testing
    • Fallback mechanisms
    • Performance monitoring
  3. Multi-tenancy Security

    • Regular security audits
    • Penetration testing
    • Data isolation validation

Process Risks

  1. Integration Complexity

    • Regular integration testing
    • Clear API contracts
    • Comprehensive documentation
  2. Performance at Scale

    • Load testing each sprint
    • Performance benchmarks
    • Scalability testing

Success Metrics

  • 90% test coverage
  • <100ms API response time
  • <1s for AI operations
  • Zero tenant data leaks
  • 99.9% uptime

Post-MVP Features (Backlog)

  1. Advanced audio processing
  2. Enterprise SSO integration
  3. Advanced analytics
  4. Custom model training
  5. Advanced knowledge graph features

Notes

  • Sprint planning should be adjusted based on team velocity
  • Regular security audits should be conducted
  • Performance testing should be ongoing
  • User feedback should be incorporated into sprint planning