You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I was trying to run it every day but I don't know where I can put this frequency. The new oozie dashboard is no longer consistent with the tutorial.
How often: I put every day
The workflow parameters: it has a dropdown list, I selected my variable - date. Then for parameter, I gave $YEAR-$MONTH-$DAY.
This time, it didn't show up error but the job is very very slow.
I'm wondering can we update our tutorial so we can have a step by step learning for newbees? And also, it would be helpful to mention the performance difference between the demo and someone who used a docker image.
http://gethue.com/hadoop-tutorials-ii-3-schedule-hive-queries-with/
I was following the old tutorial and the UI changed a lot.
date -- input path, parameter, output path? I'm not sure which one to choose. After trying a few values. It popped up the error.
The frequency of the workflow parameter "date" cannot be guessed from the frequency of the coordinator. It so needs to be specified manually.
None
The text was updated successfully, but these errors were encountered: