You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I found a strange behavior of actualtime: if I edit a completed task that is planned, the task duration is replaced by the planned duration, erasing the actualtime value that was placed there when the task was first completed.
The expected behavior, that happens in the last versions of the plugin, is that the duration time should preserve the actualtime's value, even if I edit the task later.
I think that i misexplained myself in the last issue that I openned, but here it is, for registration: 129
As @OscarBeiroanswered in the issue:
...It makes sense that duration is updated with a real or near-real one, so you can compare both and watch for significant deviations.
What is not happening: the planned duration is overwritting the real duration (timed by actualtime).
I'm using GLPI 10.0.11 and actualtime 3.0.0.
Thanks for the attention.
The text was updated successfully, but these errors were encountered:
Hello!
I found a strange behavior of actualtime: if I edit a completed task that is planned, the task duration is replaced by the planned duration, erasing the actualtime value that was placed there when the task was first completed.
The expected behavior, that happens in the last versions of the plugin, is that the duration time should preserve the actualtime's value, even if I edit the task later.
I think that i misexplained myself in the last issue that I openned, but here it is, for registration: 129
As @OscarBeiro answered in the issue:
What is not happening: the planned duration is overwritting the real duration (timed by actualtime).
I'm using GLPI 10.0.11 and actualtime 3.0.0.
Thanks for the attention.
The text was updated successfully, but these errors were encountered: