Centralizing Rate Limits #901
Triggered via pull request
September 19, 2024 06:33
Status
Failure
Total duration
21m 31s
Artifacts
–
tests.yml
on: pull_request
Matrix: lint
Matrix: pre-commit
Matrix: test
Annotations
6 errors
lint (3.11)
Process completed with exit code 1.
|
pre-commit (3.11)
Process completed with exit code 1.
|
pre-commit (3.12)
The job was canceled because "_3_11" failed.
|
test (3.11)
Process completed with exit code 1.
|
test (3.12)
The job was canceled because "_3_11" failed.
|
test (3.12)
The operation was canceled.
|