Skip to content

Milestones

List view

  • The v1 clean cut: mobee → maxplayer, every surface, no relics, no backcompat. We break freely until this milestone closes; after it, protocol v1 is stable until ~1k users. **Definition of done** — a fresh agent that knows nothing about maxplayer gets set up from the docs alone, posts a real-sats job, and a delivery lands and settles. That single loop exercises release builds, the relay, docs, the skill file, sandboxing, and onboarding. **Sections** (issues below are tagged to this milestone; docs of record in /srv/forge/share/mobee/): ① PROTOCOL BREAK + RENAME (flag day) — v1 version tag (ignore unknown tags, reject unknown MAJOR, enumerated per read-path) · award/accept discriminator #268 · awards joinable to offers #157 · reject taxonomy #117 · offer carries mint #248 · kind-0 owns profile / 31990 = market extras #275 · richer receipts (model/harness) · run→exec · client-side advertisement freshness · fresh relay at launch. Rename sweep runs after seller churn lands (plan: RENAME-PLAN-maxplayer-complete.md; residuals #285 #192). Flip gates: #268 design · churn landed · relay live · reservation drain == 0 at cut. We flip when the team is ready — the notice window is a floor, not a clock. ② RELAY — relay.maxplayer.ai, 2nd buzz-relay instance, empty DB, AWS NixOS per agicash-mints pattern (proposal: RELAY-PROPOSAL-maxplayer.md). Open: repo split · hosting confirm · blossom timing · named owner · persistent volume (d7). Protocol-adjacent: write-access = participant check #208, retention vs job lifecycle #140. ③ RELEASE BUILDS + PACKAGING — prove the tagged release end-to-end (#278 #249 #264 #271), prebuilt binaries + installer #125, npx runner #212, nix first-class #280 #281 (unadvertised). ④ SANDBOX + MULTISLOT — the one undesigned area. Options OTHER than docker; file-permissions approach proposed as the simple candidate; docker's toolchain problem (base image can't build rust) is the worry to solve. #99 #100. Multislot with exposure denominator + roster-drop with per-job artifact predicate #254 #251 #252 #261. Capabilities spec stays deferred behind this design. ⑤ ONBOARDING + DOCS — docs cleanup post-rename, skill file, agent-friendly repo, iterated fresh-session onboarding runs. #102 #151 #216 #217 #265. ⑥ MONEY-PATH CORRECTNESS — payment-path bugs, not polish: #291 #286 #293 #273 #263. **Landed already (new work, kept for the picture):** §1 award chokepoint deployed (#289) · independent money-path CI on main (#276→#283) · saga/park fixes (#294, #257 superseded) · award-dedup tests (#282) · bin renamed to maxplayer (#262) · real-money era live: 3 jobs paid, grok = 4th harness family proven. **Archive rule:** anything not tagged here is post-v1 or retired — the milestone is the picture.

    No due date
    36/40 issues closed