Skip to content

Milestones

List view

  • Make the Avalanche C-Chain mainnet cutover a config flip plus three pre-built, pre-tested code paths: avalanche network wiring + guard-railed deploy:mainnet + mainnet auditor custody, a real production Groth16 ceremony, and the mainnet-ready docs/Go-No-Go checklist. Nothing here is broadcast to mainnet; it is all built and dry-run on forks/testnet.

    No due date
    3/3 issues closed
  • Add the first-class live-testnet e2e tier (real Fuji USDC/EURC, real running BenzoNet 68420, real CCTP + Circle Iris) plus a fundless Fuji-fork PR tier, and wire CI so PRs stay fundless while nightly funded suites prove every flow end-to-end.

    No due date
    1/1 issues closed
  • Build the top wallet (W2 handle-send + claim links, W3 selective disclosure) and console (C1 batch payroll funding + multi-token, C2 audit packets + KYC allowlist, C3 cross-chain treasury) features on top of the depositFor primitive and CCTP core.

    No due date
    7/7 issues closed
  • Deliver the one-tap cross-chain onramp: the Avalanche mint-recipient router that deposits-on-behalf into eERC, the source-chain burn builder, the onramp intent persistence/API, and the gas-sponsoring relayer job. Shared by wallet W1 and console C3.

    No due date
    4/4 issues closed
  • Land the tier-aware config surface, the token/CCTP registries, the eERC deposit-on-behalf primitive, and a real-Circle-USDC converter on Fuji. Everything downstream depends on these. After M1 the repo has clean STAGING(testnet)/PROD(mainnet) separation, real USDC/EURC wrapped, and depositFor available.

    No due date
    5/5 issues closed
  • Demo script, slides, Builder Hub submission

    Overdue by 5 day(s)
    Due by July 18, 2026
    3/3 issues closed
  • Wallet + Console shippable

    Overdue by 7 day(s)
    Due by July 16, 2026
    14/14 issues closed
  • API: onboarding, payroll runner, auditor, network admin

    Overdue by 10 day(s)
    Due by July 13, 2026
    7/7 issues closed
  • eERC + Benzo contracts deployed on C-Chain Fuji and BenzoNet

    Overdue by 12 day(s)
    Due by July 11, 2026
    11/11 issues closed
  • BenzoNet L1 live on Fuji + VM infra

    Overdue by 14 day(s)
    Due by July 9, 2026
    7/7 issues closed