Make the Avalanche C-Chain mainnet cutover a config flip plus three pre-built, pre-tested code paths: avalanche network wiring + guard-railed deploy:mainnet + mainnet auditor custody, a real production Groth16 ceremony, and the mainnet-ready docs/Go-No-Go checklist. Nothing here is broadcast to mainnet; it is all built and dry-run on forks/testnet.
No due date•3/3 issues closedAdd the first-class live-testnet e2e tier (real Fuji USDC/EURC, real running BenzoNet 68420, real CCTP + Circle Iris) plus a fundless Fuji-fork PR tier, and wire CI so PRs stay fundless while nightly funded suites prove every flow end-to-end.
No due date•1/1 issues closedBuild the top wallet (W2 handle-send + claim links, W3 selective disclosure) and console (C1 batch payroll funding + multi-token, C2 audit packets + KYC allowlist, C3 cross-chain treasury) features on top of the depositFor primitive and CCTP core.
No due date•7/7 issues closedDeliver the one-tap cross-chain onramp: the Avalanche mint-recipient router that deposits-on-behalf into eERC, the source-chain burn builder, the onramp intent persistence/API, and the gas-sponsoring relayer job. Shared by wallet W1 and console C3.
No due date•4/4 issues closedLand the tier-aware config surface, the token/CCTP registries, the eERC deposit-on-behalf primitive, and a real-Circle-USDC converter on Fuji. Everything downstream depends on these. After M1 the repo has clean STAGING(testnet)/PROD(mainnet) separation, real USDC/EURC wrapped, and depositFor available.
No due date•5/5 issues closedDemo script, slides, Builder Hub submission
Overdue by 5 day(s)•Due by July 18, 2026•3/3 issues closedWallet + Console shippable
Overdue by 7 day(s)•Due by July 16, 2026•14/14 issues closedAPI: onboarding, payroll runner, auditor, network admin
Overdue by 10 day(s)•Due by July 13, 2026•7/7 issues closedeERC + Benzo contracts deployed on C-Chain Fuji and BenzoNet
Overdue by 12 day(s)•Due by July 11, 2026•11/11 issues closedBenzoNet L1 live on Fuji + VM infra
Overdue by 14 day(s)•Due by July 9, 2026•7/7 issues closed