Repository navigation
Archive the rung-3 feasibility read - #64
Merged
Merged
Conversation
…r layer's needs Read-only assessment (sol lane, 2026-08-15, microcosm @ b420d4ed): rung 3 is a hybrid — joinable survey spine and state-year context, engine-computed benefit chain, imputation for the QC operational layer (utility/SUA treatment, deduction composition, certification timing, expedited service). Two structural findings: Microcosm's SNAP grain is the SPM unit, not the QC assistance unit; and Microcosm ages calibration-target dollar leaves, not survey records — no shipped FY2026/27 SNAP weight product exists, so the future-year population path is new work in either home. Colorado prototype estimate: 24-45 lane-days across seven sequenced clusters, engine parity first.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Dated read-only assessment of what Microcosm's SNAP units carry versus what rung 3 (Colorado-first prototype) needs — 43-row gap table + memo, every PRESENT claim cited to microcosm file:line at b420d4ed. Documents the JOIN/DERIVE/IMPUTE verdict per cluster, the SPM-unit-vs-assistance-unit mismatch, the target-side (not record-side) scope of Microcosm's aging today, and the sequenced 24–45 lane-day estimate. No code changes.
🤖 Generated with Claude Code