Skip to content

[CI] Add a scheduled workflow for tests and benchmarks #289

[CI] Add a scheduled workflow for tests and benchmarks

[CI] Add a scheduled workflow for tests and benchmarks #289

Triggered via pull request August 5, 2024 11:02
Status Failure
Total duration 11m 48s
Artifacts

pull_request.yml

on: pull_request
Soundness  /  API breakage check
2m 34s
Soundness / API breakage check
Soundness  /  Documentation check
1m 59s
Soundness / Documentation check
Soundness  /  Unacceptable language check
6s
Soundness / Unacceptable language check
Soundness  /  License headers check
10s
Soundness / License headers check
Soundness  /  Broken symlinks check
5s
Soundness / Broken symlinks check
Soundness  /  Format check
45s
Soundness / Format check
Soundness  /  Shell check
7s
Soundness / Shell check
Swift 6 Language Mode  /  Swift 6 language mode
1m 5s
Swift 6 Language Mode / Swift 6 language mode
Matrix: Benchmarks / Benchmarks / linux
Matrix: Cxx interop / Cxx interop / linux
Matrix: Integration Tests / linux
Matrix: Unit tests / Unit tests / linux
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Swift 6 Language Mode / Swift 6 language mode
Process completed with exit code 1.
Integration Tests / Linux (5.10)
Canceling since a higher priority waiting request for 'PR-refs/pull/2822/merge-Integration tests' exists
Integration Tests / Linux (5.10)
The operation was canceled.
Integration Tests / Linux (5.8)
Canceling since a higher priority waiting request for 'PR-refs/pull/2822/merge-Integration tests' exists
Integration Tests / Linux (5.8)
The operation was canceled.
Integration Tests / Linux (5.9)
Canceling since a higher priority waiting request for 'PR-refs/pull/2822/merge-Integration tests' exists
Integration Tests / Linux (5.9)
The operation was canceled.
Integration Tests / Linux (nightly-main)
Canceling since a higher priority waiting request for 'PR-refs/pull/2822/merge-Integration tests' exists
Integration Tests / Linux (nightly-main)
The operation was canceled.
Integration Tests / Linux (nightly-6.0)
Canceling since a higher priority waiting request for 'PR-refs/pull/2822/merge-Integration tests' exists
Integration Tests / Linux (nightly-6.0)
The operation was canceled.