chore(deps): bump library/node from 22.8.0 to 22.9.0 in /ui-test (#19… #33029
ci-build.yaml
on: push
changes
6s
Ensure Go modules synchronicity
38s
Lint Go code
32s
Check changes to generated code
37s
Matrix: Run end-to-end tests
Run unit tests with -race for Go packages
0s
E2E Tests - Composite result
0s
Process & analyze test artifacts
0s
Annotations
11 errors
Lint Go code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Lint Go code
The operation was canceled.
|
Check changes to generated code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Check changes to generated code
The operation was canceled.
|
Ensure Go modules synchronicity
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Ensure Go modules synchronicity
The operation was canceled.
|
Build, test & lint UI code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Build, test & lint UI code
The operation was canceled.
|
Build & cache Go code
Canceling since a higher priority waiting request for 'Integration tests-refs/heads/master' exists
|
Build & cache Go code
The operation was canceled.
|
E2E Tests - Composite result
Process completed with exit code 1.
|