Milestones
List view
Planned evidence/acceptance milestone, not a promised benchmark result, release date or SOTA claim. Freeze exact source, hardware/network, dataset generator, query shapes, concurrency, consistency and write-durability settings. Validate the roadmap target of 10 million vertices and 50 million edges with independent correctness oracles; measure real multi-machine scaling, mixed concurrent reads/writes, skew/high-degree graphs, cold/warm caches and sustained historical workloads. Report throughput, p50/p95/p99, CPU/RSS, network/storage amplification, remote request cost and failure behavior. Compare mature systems only under equivalent semantics and documented configurations; unsupported operations are not successful samples. Reuse #110/#111/#127 evidence, without replacing core correctness gates or using CoreHR-specific optimizations. Performance regression checks apply throughout all milestones; this stage consolidates reproducible scale qualification and honest limitations.
No due date•0/2 issues closedPlanned acceptance milestone, not automatic production readiness, a date or SOTA certification. Validate real multi-machine node/leader failures, network partitions, sustained load and recovery drills with explicit availability, RPO/RTO and residual-risk evidence. Define and test rolling upgrades, supported mixed protocol/storage versions, migrations and feasible rollback paths without silent corruption or view changes. Complete scoped authentication/authorization, internal service isolation, transport protection, resource/tenant isolation and bounded audit behavior. Publish supported deployment/compatibility and failure matrices. Reuse v0.0.3 elasticity and v0.0.4 observability rather than duplicate them. Necessary security gates apply before any public deployment, not only at this milestone. Exact-source review and reproducible fault/upgrade/security tests are required; unsupported combinations remain explicit. GitHub Pages product documentation delivery is required for this milestone: a complete repository-maintained project site with project introduction, verified getting started, documentation navigation, supported versions and known limitations, contributor guidance and release navigation. Reuse repository documentation as the maintained source of truth, with reproducible automatic build/deployment and checks for links, mobile layouts and published navigation/content against the verified release. Clearly distinguish released features from planned work. This is a planning requirement, not a claim the site is built or deployed. It is separate from #220 interactive graph-query Portal and #122 operational observability; neither substitutes for a complete documentation site.
No due date•0/2 issues closedPlanned acceptance milestone extending #196, not a completed feature, release date or SOTA claim. Reuse existing temporal and managed execution: atomic cross-shard vertex/edge changes and traversals at one system version V and valid time T; retrospective corrections, future-effective changes and deletion semantics; public query entrypoints and stable old-view pagination. Restore every advertised temporal record/index from one verified checkpoint cut before READY. Validate concurrent writes, partial apply/Abort, original-ID recovery and process restart with independent two-dimensional CoreHR and non-HR oracles, including full-scale dynamic data and bounded history/resource costs. Local temporal tests or managed vertex-only support do not satisfy the complete gate. Existing core milestones and recovery prerequisites remain unchanged.
No due date•0/6 issues closedPlanned acceptance milestone, not an implementation, release date or SOTA claim. Extend #191 beyond v0.0.2 checkpoint backup: define remote-durable write ACK and required commit/log closure; validate immutable manifest/CAS publication, writer fencing and bounded cache/index-plus-delta reads. Recover every acknowledged write after total loss of local caches; missing/corrupt objects or log suffixes must fail closed before READY. State measured RPO/RTO and independently validate supported S3, OSS and TOS behavior, not only an S3-compatible CI backend. Preserve original IDs, fixed views and existing recovery prerequisites. Acceptance requires exact-source independent review, failure/recovery tests and reproducible evidence. Existing milestone scopes remain unchanged.
No due date•0/2 issues closedPlanned experimental preview after core gates. Bounded read-only graph/table portal (#220), same HTTP and pinned-view rules, actionable bounded observability (#122), browser failure/cancel/pagination/NotReady tests and clean onboarding. Not production security or HA certification. No delivery date. Full acceptance: https://github.com/ashione/VelaGraph/blob/main/docs/RELEASE_PLAN.md .
No due date•0/3 issues closedPlanned experimental prerelease. Readiness-aware ingress/session ownership (#221); versioned discovery, eligible replicas and safe shard migration/fencing (#222); bounded conflict-aware write concurrency (#223). Validate stale routes, old cursors, lost ACK, moves/restarts and independent graph oracles. Multi-machine evidence required before throughput/HA claims. No fixed date. Scope and dependencies: https://github.com/ashione/VelaGraph/blob/main/docs/RELEASE_PLAN.md .
No due date•4/17 issues closedPlanned experimental prerelease; no due date or production claim. Bounded active/retained authority, streamed recovery and explicit retention rules; managed certified full-scale dynamic CoreHR plus non-HR oracle; certified global checkpoint/manifest and restore-before-READY. Preserve #124 safety prerequisite and offline restore guard. Object-store authority/zero RPO are not included. Acceptance: https://github.com/ashione/VelaGraph/blob/main/docs/RELEASE_PLAN.md .
No due date•25/40 issues closedExperimental prerelease scope, not a delivery date or production/HA claim. Reproducible clean startup; shared HTTP/gRPC write and supported Gremlin query handlers; fixed consistent V and original-ID recovery; explicit readiness, capacity and compatibility boundaries. Release only after scoped acceptance and clean-environment verification. Authoritative plan: https://github.com/ashione/VelaGraph/blob/main/docs/RELEASE_PLAN.md#v001--bounded-fixed-topology-experimental-service . Umbrella #224 remains open across versions.
No due date•59/59 issues closed