Skip to content

Milestones

List view

  • Long-tail durability, health monitoring, and adoption experience. Issues: #1605, #1748, #1608, #1606. ⚠️ #1606 is product-decision-blocked: do teams re-run Squad often enough that state persistence is worth the implementation complexity? That question must be answered by observed usage before #1606 can be scoped.

    No due date
    4/7 issues closed
  • ⚠️ HARD GATE: Do not start M4 before M2 produces a VALIDATED verdict. M4's entire premise is that there is an autonomous merge path worth gating. That is precisely what the 2026-08-21 E2E run tests. If autonomy is falsified, M4 is REPLACED by a scope-contraction RFC — not delayed, not deferred, replaced. Issues: #1729, #1733, #1734, #1735, #1736.

    No due date
    3/6 issues closed
  • Post-E2E hardening on the path M2 validates as working. Exit criteria: Forced double /squad implement produces no duplicate squad/implement-{N} branches. Machine-readable PR provenance marker is present on every agent PR. Relay REFUSES a merge into a non-default branch. A well-formatted-but-bad plan is REJECTED by validate. Issues: #1730, #1731, #1757. Unblocked only after M2 produces a VALIDATED verdict.

    No due date
    6/6 issues closed
  • ⚠️ Evidence-blocked by design. Contents populated by the 2026-08-21 E2E run. The measurable outcome is the DECISION RULE, not a shipped feature: every lifecycle stage tagged WORKING / BROKEN / NEVER-EXERCISED; every broken stage gets a filed defect with a repro; the falsification condition is evaluated. VALIDATED → proceed to M3 and M4. FALSIFIED → open a scope-contraction RFC instead of M4. M4 is REPLACED, not delayed.

    No due date
    11/11 issues closed
  • Ship all six wave:1-next fixes before the 2026-08-21 E2E run. Exit criteria: All six issues merged to dev. gh aw compile exits 0 on every squad* workflow. The #1732 compile gate demonstrably FAILS a deliberately-broken workflow in CI. bradygaster/aspiregregator-squad-e2e has 'Allow GitHub Actions to create and approve pull requests' enabled. Issues: #1772, #1758, #1759, #1732, #1761, #1756

    No due date
    6/6 issues closed
  • Patch release: version indicator fix and pre-release semver support

    No due date
  • Bug fixes and quality - patch release

    No due date
    13/13 issues closed
  • CI/CD hardening, memory improvements, feature work

    No due date
    21/21 issues closed