Skip to content

deel-lip supports until TensorFlow 2.15 #530

deel-lip supports until TensorFlow 2.15

deel-lip supports until TensorFlow 2.15 #530

Triggered via pull request August 5, 2024 13:30
Status Failure
Total duration 1m 6s
Artifacts

python-tests.yml

on: pull_request
Matrix: checks
Fit to window
Zoom out
Zoom in

Annotations

7 errors
checks (3.9, 2.7)
Process completed with exit code 1.
checks (3.10, 2.11)
The job was canceled because "_3_9_2_7" failed.
checks (3.10, 2.11)
Process completed with exit code 1.
checks (3.10, 2.15)
The job was canceled because "_3_9_2_7" failed.
checks (3.10, 2.15)
The operation was canceled.
checks (3.7, 2.3)
The job was canceled because "_3_9_2_7" failed.
checks (3.7, 2.3)
The operation was canceled.