Skip to content

From inf-base : TF, Providers, TFLint, PreCommit upgrade #62

From inf-base : TF, Providers, TFLint, PreCommit upgrade

From inf-base : TF, Providers, TFLint, PreCommit upgrade #62

Triggered via push March 19, 2024 14:54
Status Failure
Total duration 46s
Artifacts 9

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

16 errors
build (1.6.1)
Process completed with exit code 123.
build (1.6.0)
Process completed with exit code 123.
build (1.6.2)
The job was canceled because "_1_6_1" failed.
build (1.6.2)
Process completed with exit code 123.
build (1.7.0)
The job was canceled because "_1_6_1" failed.
build (1.7.0)
Process completed with exit code 123.
build (1.6.4)
The job was canceled because "_1_6_1" failed.
build (1.6.4)
Process completed with exit code 123.
build (1.6.6)
The job was canceled because "_1_6_1" failed.
build (1.6.6)
Process completed with exit code 123.
build (1.7.1)
The job was canceled because "_1_6_1" failed.
build (1.7.1)
The operation was canceled.
build (1.6.5)
The job was canceled because "_1_6_1" failed.
build (1.6.5)
The operation was canceled.
build (1.6.3)
The job was canceled because "_1_6_1" failed.
build (1.6.3)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
logs-1.6.0 Expired
448 KB
logs-1.6.1 Expired
448 KB
logs-1.6.2 Expired
448 KB
logs-1.6.3 Expired
448 KB
logs-1.6.4 Expired
448 KB
logs-1.6.5 Expired
448 KB
logs-1.6.6 Expired
448 KB
logs-1.7.0 Expired
448 KB
logs-1.7.1 Expired
449 KB