Chore(deps): bump the crates-io group across 1 directory with 2 updates #593
Triggered via pull request
September 24, 2024 21:25
Status
Failure
Total duration
3m 24s
Artifacts
–
build.yml
on: pull_request
Features
36s
Run benchmarks
52s
Check for documentation errors
36s
Measure coverage
2m 2s
Check semver compatibility
3m 12s
Format
3s
Clippy
41s
Clippy (Nightly)
39s
Matrix: Build+test
Annotations
14 errors
Features
Process completed with exit code 101.
|
Build+test (stable, ubuntu-20.04)
Process completed with exit code 101.
|
Clippy (Nightly)
Process completed with exit code 101.
|
Build+test (windows-latest, stable)
The job was canceled because "stable_ubuntu-20_04" failed.
|
Build+test (windows-latest, stable)
The operation was canceled.
|
Clippy
Process completed with exit code 101.
|
Build+test (beta, ubuntu-20.04)
The job was canceled because "stable_ubuntu-20_04" failed.
|
Build+test (beta, ubuntu-20.04)
The operation was canceled.
|
Run benchmarks
Process completed with exit code 101.
|
Build+test (macos-latest, stable)
The job was canceled because "stable_ubuntu-20_04" failed.
|
Build+test (macos-latest, stable)
The operation was canceled.
|
Build+test (nightly, ubuntu-20.04)
The job was canceled because "stable_ubuntu-20_04" failed.
|
Build+test (nightly, ubuntu-20.04)
The operation was canceled.
|
Measure coverage
Process completed with exit code 101.
|