Skip to content

Chore(deps): bump the crates-io group across 1 directory with 2 updates #593

Chore(deps): bump the crates-io group across 1 directory with 2 updates

Chore(deps): bump the crates-io group across 1 directory with 2 updates #593

Triggered via pull request September 24, 2024 21:25
Status Failure
Total duration 3m 24s
Artifacts

build.yml

on: pull_request
Features
36s
Features
Run benchmarks
52s
Run benchmarks
Check for documentation errors
36s
Check for documentation errors
Measure coverage
2m 2s
Measure coverage
Check semver compatibility
3m 12s
Check semver compatibility
Format
3s
Format
Clippy
41s
Clippy
Clippy (Nightly)
39s
Clippy (Nightly)
Matrix: Build+test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Features
Process completed with exit code 101.
Build+test (stable, ubuntu-20.04)
Process completed with exit code 101.
Clippy (Nightly)
Process completed with exit code 101.
Build+test (windows-latest, stable)
The job was canceled because "stable_ubuntu-20_04" failed.
Build+test (windows-latest, stable)
The operation was canceled.
Clippy
Process completed with exit code 101.
Build+test (beta, ubuntu-20.04)
The job was canceled because "stable_ubuntu-20_04" failed.
Build+test (beta, ubuntu-20.04)
The operation was canceled.
Run benchmarks
Process completed with exit code 101.
Build+test (macos-latest, stable)
The job was canceled because "stable_ubuntu-20_04" failed.
Build+test (macos-latest, stable)
The operation was canceled.
Build+test (nightly, ubuntu-20.04)
The job was canceled because "stable_ubuntu-20_04" failed.
Build+test (nightly, ubuntu-20.04)
The operation was canceled.
Measure coverage
Process completed with exit code 101.