Merge pull request #3041 from lima-vm/dependabot/github_actions/githu… #6574
test.yml
on: push
Lints
1m 59s
Spell check
12s
Windows tests
1m 33s
Integration tests (QEMU, macOS host)
9m 36s
VMNet tests (QEMU)
8m 6s
Matrix: Colima tests (QEMU, Linux host)
Matrix: Integration tests (QEMU, Linux host)
Matrix: Unit tests
Matrix: Upgrade tests (QEMU, macOS host)
Matrix: Integration tests (vz)
Annotations
7 warnings
Integration tests (QEMU, Linux host) (alpine.yaml)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Integration tests (QEMU, Linux host) (../hack/test-templates/net-user-v2.yaml)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Integration tests (vz) (default.yaml, true)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests (QEMU, macOS host)
curl 8.11.1 is already installed and up-to-date.
To reinstall 8.11.1, run:
brew reinstall curl
|
Integration tests (QEMU, macOS host)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests (vz) (fedora.yaml, false)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Colima tests (QEMU, Linux host) (v0.6.5)
Attempt 1 failed. Reason: Child_process exited with error code 1
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
failure-logs-qemu-linux-alpine_yaml
|
35.7 KB |
|
failure-logs-upgrade
|
38.4 KB |
|