@eme64 eme64 commented Oct 20, 2025

In PhaseIdealLoop::create_new_if_for_multiversion, we replace multiversion_slow_proj with the new region that merges the new_multiversion_slow_proj and new_if_false. Using igvn.replace_node moves all the control inputs of the outputs of the old multiversion_slow_proj to the new region. This is sufficient during IGVN, but not during loop-opts: the "controllees" of multiversion_slow_proj (the nodes that used to answer to get_ctrl with multiversion_slow_proj) should now be "controllees" of region (answer region for get_ctrl).

This is what lazy_replace is for:

  • It puts a "forwarding" in the _loop_and_ctrl table: instead of mapping multiversion_slow_proj to its loop, it now points to the new ctrl node region.
  • When we call get_ctrl on a "controllee" of the old multiversion_slow_proj, we then skip over multiversion_slow_proj via the "forwarding" to the new region.

I'm proposing a PR to improve the documentation and some renamings around get_ctrl and lazy_replace:
#27892

A previous PR that used lazy_replace, in case you want to understand more:
#15720


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8369898: C2 SuperWord: assert(has_ctrl(i)) failed: should be control, not loop (Bug - P3)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/27889/head:pull/27889
$ git checkout pull/27889

Update a local copy of the PR:
$ git checkout pull/27889
$ git pull https://git.openjdk.org/jdk.git pull/27889/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 27889

View PR using the GUI difftool:
$ git pr show -t 27889

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/27889.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Oct 20, 2025

👋 Welcome back epeter! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Oct 20, 2025

@eme64 This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8369898: C2 SuperWord: assert(has_ctrl(i)) failed: should be control, not loop

Reviewed-by: chagedorn, kvn

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 118 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot changed the title JDK-8369898 8369898: C2 SuperWord: assert(has_ctrl(i)) failed: should be control, not loop Oct 20, 2025
@openjdk
Copy link

openjdk bot commented Oct 20, 2025

@eme64 The following label will be automatically applied to this pull request:

  • hotspot-compiler

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.

@mlbridge
Copy link

mlbridge bot commented Oct 20, 2025

Webrevs

Copy link
Member

@chhagedorn chhagedorn left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

The fix looks reasonable to me and I agree that we should improve the documentation for lazy_replace() and also think about it's naming - by just looking at the name, one could first guess that the actual node replacement is delayed which is not the case!

Maybe @rwestrel also wants to have a look who worked with lazy_replace() in the mentioned PR #15720.

@openjdk openjdk bot added the ready Pull request is ready to be integrated label Oct 20, 2025
Co-authored-by: Christian Hagedorn <[email protected]>
@openjdk openjdk bot removed the ready Pull request is ready to be integrated label Oct 20, 2025
@eme64
Copy link
Contributor Author

eme64 commented Oct 20, 2025

@chhagedorn Thanks for the suggestions, they are all applied :)

Copy link
Member

@chhagedorn chhagedorn left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Update looks good, thanks!

@openjdk openjdk bot added the ready Pull request is ready to be integrated label Oct 20, 2025
Copy link
Contributor

@vnkozlov vnkozlov left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Good.

@eme64
Copy link
Contributor Author

eme64 commented Oct 21, 2025

@chhagedorn @vnkozlov Thanks for the reviews!

/integrate

@openjdk
Copy link

openjdk bot commented Oct 21, 2025

Going to push as commit 634746a.
Since your change was applied there have been 124 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Oct 21, 2025
@openjdk openjdk bot closed this Oct 21, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Oct 21, 2025
@openjdk
Copy link

openjdk bot commented Oct 21, 2025

@eme64 Pushed as commit 634746a.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

hotspot-compiler [email protected] integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

3 participants