Sync committee Pectra updates #2043
ci.yml
on: pull_request_target
Check Workspace
0s
Unit Tests
0s
Integration Tests
1m 52s
Check ismp-solidity
49s
Hyperclient Integration Tests
2m 0s
Matrix: Check Wasm Crates
Annotations
9 errors
Check Wasm Crates (nexus-runtime)
The run was canceled by @Wizdave97.
|
Check Wasm Crates (gargantua-runtime)
The run was canceled by @Wizdave97.
|
Check Workspace
The run was canceled by @Wizdave97.
|
Unit Tests
The run was canceled by @Wizdave97.
|
Integration Tests
The run was canceled by @Wizdave97.
|
Integration Tests
Process completed with exit code 14.
|
Integration Tests
The operation was canceled.
|
Hyperclient Integration Tests
The run was canceled by @Wizdave97.
|
Hyperclient Integration Tests
The operation was canceled.
|