2 changes: 1 addition & 1 deletion configuration_file/config.yaml
Original file line number Diff line number Diff line change
Expand Up @@ -124,7 +124,7 @@ production pathways:
variable: Production|Hydrogen|PEM
ecoinvent alias:
name: hydrogen production, gaseous, 25 bar, from electrolysis, for ammonia production
reference product: Hydrogen, gaseous, 25 bar
reference product: hydrogen, gaseous, 25 bar
exists in original database: True
regionalize: True
efficiency:
Expand Down
2 changes: 1 addition & 1 deletion datapackage.json
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,7 @@
"title": "Ammonia decarbonisation pathways and their effects on life cycle assessments: Integrating future ammonia scenarios into background data for prospective LCAs",
"description": "Implementation of the scenarios on future ammonia supply from the Master thesis of J. Boyce, 2022.",
"source":"Boyce, J. C. (2022). Ammonia decarbonisation pathways and their effects on life cycle assessments: Integrating future ammonia scenarios into background data for prospective LCAs [Master’s Thesis, Leiden University and TU Delft].",
"version": "0.0.2",
"version": "0.0.3",
"contributors":[
{
"title": "Johanna C. Boyce",
Expand Down
12 changes: 6 additions & 6 deletions inventories/lci-ammonia.csv
Original file line number Diff line number Diff line change
Expand Up @@ -30,8 +30,8 @@ Exchanges,,,,,,,,,,,,
name,amount,database,location,unit,categories,type,uncertainty type,allocation,comment,product,reference product,simapro name
"Water, cooling, unspecified natural origin",0.0832,biosphere3,,cubic meter,natural resource::in water,biosphere,0,,RECCS 2007,,,
"CO2 capture/at H2 production plant, pre, pipeline 200km, storage 1000m (excluding electricity)",1,new_activities,RER,kilogram,CCS Europe 2025::Wood::Geological storage::BIGCC,production,,100,,,"CO2 capture/at H2 production plant, pre, pipeline 200km, storage 1000m","CO2 capture/at H2 production plant, pre, pipeline 200km, storage 1000m/RER U"
"CO2 storage/at H2 production plant, pre, pipeline 200km, storage 1000m",1,premise1,RER,kilogram,Materials/fuels,technosphere,0,,,,"CO2 storage/at H2 production plant, pre, pipeline 200km, storage 1000m","CO2 storage/at H2 production plant, pre, pipeline 200km, storage 1000m/RER U"
Selexol (Dimethylether of polyethylene glycol)/RER,0.000007,premise1,RER,kilogram,Materials/fuels,technosphere,0,,Singh et al. (2011),,Selexol (Dimethylether of polyethylene glycol)/RER,
"carbon dioxide storage at hydrogen production plant, pre, pipeline 200km, storage 1000m",1,premise1,RER,kilogram,Materials/fuels,technosphere,0,,,,"carbon dioxide storage at hydrogen production plant, pre, pipeline 200km, storage 1000m","carbon dioxide storage at hydrogen production plant, pre, pipeline 200km, storage 1000m"
selexol (Dimethylether of polyethylene glycol),0.000007,premise1,RER,kilogram,Materials/fuels,technosphere,0,,Singh et al. (2011),,selexol (Dimethylether of polyethylene glycol),
"heat pump production, heat and power co-generation unit, 160kW electrical",9.86E-09,premise1,RER,unit,Materials/fuels,technosphere,0,,n_HX = n_total*lifetime_ratio/(lifetime_plant*annual m_flow),"heat pump, heat and power co-generation unit, 160kW electrical","heat pump, heat and power co-generation unit, 160kW electrical",Heat exchanger of cogen unit 160kWe/RER/I U
"market for absorption chiller, 100kW",1.97E-08,premise1,GLO,unit,Materials/fuels,technosphere,0,,n_absorption chiller = n_total*lifetime_ratio/(lifetime_plant*annual m_flow),"absorption chiller, 100kW","absorption chiller, 100kW",Absorption chiller 100kW/CH/I U
"market for gas turbine, 10MW electrical",9.86E-09,premise1,GLO,unit,Materials/fuels,technosphere,0,,n_GT = n_total*lifetime_ratio/(lifetime_plant*annual m_flow),"gas turbine, 10MW electrical","gas turbine, 10MW electrical","Gas turbine, 10MWe, at production plant/RER/I U"
Expand Down Expand Up @@ -721,14 +721,14 @@ syngas and flue gas CO2 transport and injection in a geological reservoir,1000,n
Activity,"hydrogen production, gaseous, 25 bar, from electrolysis, for ammonia production",,,,,,,,,,,
production amount,1,,,,,,,,,,,
comment,"1 kg H2 produced using a PEM electrolyzer. Source: Bareiss, K., de la Rua, C., Moeckl, M., Hamacher, T., 2019. Life cycle assessment of hydrogen from proton exchange membrane water electrolysis in future energy systems 237, 862-872. 10.1016/j.apenergy.2019.01.001",,,,,,,,,,,
reference product,"Hydrogen, gaseous, 25 bar",,,,,,,,,,,
reference product,"hydrogen, gaseous, 25 bar",,,,,,,,,,,
location,RER,,,,,,,,,,,
unit,kilogram,,,,,,,,,,,
Exchanges,,,,,,,,,output pressure H2 of PEM is usually around 25-30 bar,,,Note
name,amount,database,location,unit,type,reference product,categories,comment,energy content per kg h2,120,MJ/kg H2,
"hydrogen production, gaseous, 25 bar, from electrolysis, for ammonia production",1,h2_pem,RER,kilogram,production,"Hydrogen, gaseous, 25 bar",,,efficiency electrolyzer,0.61,[-],
"electrolyzer, PEM, Balance of Plant",3.28315E-07,h2_pem,GLO,unit,technosphere,"electrolyzer, PEM, Balance of Plant",,"Assuming lifetime of electrolyzer stack of 7 years, BOP 20 years",lifetime stack (7 years),61320,[hours],
"electrolyzer, PEM, Stack",9.38044E-07,h2_pem,GLO,unit,technosphere,"electrolyzer, PEM, Stack",,,capacity factor,0.95,[-],High capacity factor since it is coupled to the grid. This will be much lower when coupled to renewable energy generators such as wind and PV (or autonomous configurations).
"hydrogen production, gaseous, 25 bar, from electrolysis, for ammonia production",1,h2_pem,RER,kilogram,production,"hydrogen, gaseous, 25 bar",,,efficiency electrolyzer,0.61,[-],
"electrolyzer production, 1MWe, PEM, Balance of Plant",3.28315E-07,h2_pem,RER,unit,technosphere,"electrolyzer, 1MWe, PEM, Balance of Plant",,"Assuming lifetime of electrolyzer stack of 7 years, BOP 20 years",lifetime stack (7 years),61320,[hours],
"electrolyzer production, 1MWe, PEM, Stack",9.38044E-07,h2_pem,RER,unit,technosphere,"electrolyzer, 1MWe, PEM, Stack",,,capacity factor,0.95,[-],High capacity factor since it is coupled to the grid. This will be much lower when coupled to renewable energy generators such as wind and PV (or autonomous configurations).
"market group for electricity, low voltage",54.6,ecoinvent 3.7.1,RER,kilowatt hour,technosphere,"electricity, low voltage",,Electricity consumption with 61% eff.,,,,
"market for water, deionised",12,ecoinvent 3.7.1,Europe without Switzerland,kilogram,technosphere,"water, deionised",,"A perfect reaction of H2O results in 1 kg H2 and 8 kg O2, and needs 9 kg H2O, however, considering some losses we assume 12 kg H2O. ",Simons & Bauer assumed 12.318 kg H2O per kg H2 generated (can be used as Ref.),,,"In case the LCIs are used for large-scale hydrogen production, it makes sense to add impacts for water desalinization."
Oxygen,8,biosphere3,,kilogram,biosphere,,air,this flow is available if ecoinvent 3.8 is used,,,,