PLC Modbus TCP Block #2995
unit_tests_inference_x86.yml
on: pull_request
call_is_mergeable
/
Check if branch is mergeable
2s
Matrix: build-dev-test
Annotations
9 errors and 1 warning
build-dev-test (3.8)
Process completed with exit code 1.
|
build-dev-test (3.12)
The job was canceled because "_3_8" failed.
|
build-dev-test (3.12)
The operation was canceled.
|
build-dev-test (3.11)
The job was canceled because "_3_8" failed.
|
build-dev-test (3.11)
The operation was canceled.
|
build-dev-test (3.10)
The job was canceled because "_3_8" failed.
|
build-dev-test (3.10)
The operation was canceled.
|
build-dev-test (3.9)
The job was canceled because "_3_8" failed.
|
build-dev-test (3.9)
The operation was canceled.
|
call_is_mergeable / Check if branch is mergeable
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|