build(deps): bump github.com/containers/image/v5 from 5.36.0 to 5.36.1 #2025
Red Hat Konflux / Red Hat Konflux / acs-enterprise-contract / pr group
failed
Aug 6, 2025 in 4m 43s
Failed
Integration test for snapshot acs-jml95 and scenario acs-enterprise-contract has failed
Details
- Pipelinerun: acs-enterprise-contract-68bx9
| Task | Duration | Test Suite | Status | Details |
|---|---|---|---|---|
| verify | 4m41s | ❌ FAILURE | ✔️ 6604 success(es) ❌ 11 failure(s) |
The group snapshot is generated for pr group dependabot/go_modules/github.com/containers/image/v5-5.36.1 and the component snasphots as below:
| Component | Snapshot | BuildPipelineRun | PullRequest |
|---|---|---|---|
| scanner | acs-l46l9 | scanner-on-push-rqzxz | scanner |
| scanner-db | acs-4jz4q | scanner-db-on-push-gdkfw | scanner |
| scanner-slim | acs-w2gkf | scanner-slim-on-push-rchcn | scanner |
| scanner-db-slim | acs-mmzld | scanner-db-slim-on-push-56rd6 | scanner |
Loading