build(deps): bump actions/checkout from 4 to 5 in the actions group #2041
Red Hat Konflux / Red Hat Konflux / acs-enterprise-contract / pr group
failed
Aug 14, 2025 in 4m 51s
Failed
Integration test for snapshot acs-m5zzb and scenario acs-enterprise-contract has failed
Details
- Pipelinerun: acs-enterprise-contract-r8rwt
| Task | Duration | Test Suite | Status | Details |
|---|---|---|---|---|
| verify | 4m49s | ❌ FAILURE | ✔️ 6604 success(es) ❌ 4 failure(s) |
The group snapshot is generated for pr group dependabot/github_actions/actions-a331d3ec2d and the component snasphots as below:
| Component | Snapshot | BuildPipelineRun | PullRequest |
|---|---|---|---|
| scanner-db | acs-rcnkb | scanner-db-on-push-xznbm | scanner |
| scanner-slim | acs-5dkp2 | scanner-slim-on-push-ngtsw | scanner |
| scanner | acs-dlw57 | scanner-on-push-flcql | scanner |
| scanner-db-slim | acs-jxdgx | scanner-db-slim-on-push-n4hx4 | scanner |
Loading