chore(main): release bridge-ui 2.13.0 #2307
Triggered via pull request
October 30, 2024 03:33
Status
Failure
Total duration
4h 54m 57s
Artifacts
–
bridge-ui.yml
on: pull_request
build-and-test
/
build
2h 7m
deploy_bridge-ui_devnet_preview
/
build-deploy
45m 39s
deploy_bridge-ui_hekla_preview
/
build-deploy
15m 17s
deploy_bridge-ui_mainnet_preview
/
build-deploy
1h 10m
deploy_bridge-ui_hekla_production
/
build-deploy
deploy_bridge-ui_mainnet_production
/
build-deploy
Annotations
3 errors
deploy_bridge-ui_devnet_preview / build-deploy
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
deploy_bridge-ui_devnet_preview / build-deploy
The self-hosted runner: arc-runner-set-7vkwv-runner-gstmt lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
deploy_bridge-ui_devnet_preview / build-deploy
The operation was canceled.
|