Cleanup incremental decommit - Part 1 #4213
ci-nix.yaml
on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
5m 38s
Build specification using nix
54s
nix flake check
3m 29s
Publish benchmark results
3s
Publish test results
0s
Documentation
0s
Annotations
10 errors
Build & test (hydra-plutus)
Process completed with exit code 1.
|
Build & test (plutus-merkle-tree)
The job was canceled because "hydra-plutus" failed.
|
Build & test (plutus-cbor)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-tui)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-tui)
The operation was canceled.
|
Build & test (hydra-cluster)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-cluster)
The operation was canceled.
|
Build & test (hydra-node)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-node)
The operation was canceled.
|
nix flake check
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
benchmarks-hydra-cluster-bench-e2e
|
758 Bytes |
|
benchmarks-hydra-node-micro
|
97 KB |
|
benchmarks-hydra-node-tx-cost
|
1.81 KB |
|
benchmarks-plutus-merkle-tree-on-chain-cost
|
437 Bytes |
|
haddocks
|
5.44 MB |
|
hydra-spec
|
820 KB |
|
test-results-plutus-cbor
|
709 Bytes |
|