Cleanup incremental decommit - Part 1 #4249
ci-nix.yaml
on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
8m 51s
Build specification using nix
2m 46s
nix flake check
4m 12s
Publish benchmark results
5s
Publish test results
0s
Documentation
0s
Annotations
8 errors
nix flake check
Process completed with exit code 1.
|
Build & test (hydra-plutus)
Process completed with exit code 1.
|
Build & test (hydra-tui)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-tui)
The operation was canceled.
|
Build & test (hydra-cluster)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-cluster)
The operation was canceled.
|
Build & test (hydra-node)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-node)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
benchmarks-hydra-cluster-bench-e2e
|
764 Bytes |
|
benchmarks-hydra-node-micro
|
96.9 KB |
|
benchmarks-hydra-node-tx-cost
|
1.8 KB |
|
benchmarks-plutus-merkle-tree-on-chain-cost
|
437 Bytes |
|
haddocks
|
5.44 MB |
|
hydra-spec
|
820 KB |
|
test-results-plutus-cbor
|
710 Bytes |
|
test-results-plutus-merkle-tree
|
866 Bytes |
|