Skip to content

Support mag

Support mag #248

Re-run triggered February 21, 2025 14:26
Status Failure
Total duration 5m 39s
Artifacts

test-and-lint.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
lint
Process completed with exit code 1.
test (3.11, ubuntu-latest)
The job was canceled because "_3_9_ubuntu-latest" failed.
test (3.11, ubuntu-latest)
The operation was canceled.
test (3.10, ubuntu-latest)
The job was canceled because "_3_9_ubuntu-latest" failed.
test (3.10, ubuntu-latest)
The operation was canceled.
test (3.11, windows-latest)
The job was canceled because "_3_9_ubuntu-latest" failed.
test (3.11, windows-latest)
The operation was canceled.
test (3.10, windows-latest)
The job was canceled because "_3_9_ubuntu-latest" failed.
test (3.10, windows-latest)
The operation was canceled.
test (3.9, windows-latest)
The job was canceled because "_3_9_ubuntu-latest" failed.
test (3.9, windows-latest)
The operation was canceled.
test (3.9, ubuntu-latest)
Process completed with exit code 1.