client/http: handle 503/leader/primary change to schedule member check #20244
pd-tests.yaml
on: pull_request
Matrix: chunks
report-coverage
0s
Annotations
10 errors
chunks (4, Client Integration Test)
Process completed with exit code 2.
|
chunks (6, MicroService Integration Test)
The job was canceled because "_4_Client_Integration_Tes" failed.
|
chunks (2, Unit Test(2))
The job was canceled because "_4_Client_Integration_Tes" failed.
|
chunks (2, Unit Test(2))
The operation was canceled.
|
chunks (5, TSO Integration Test)
The job was canceled because "_4_Client_Integration_Tes" failed.
|
chunks (5, TSO Integration Test)
The operation was canceled.
|
chunks (3, Tools Test)
The job was canceled because "_4_Client_Integration_Tes" failed.
|
chunks (3, Tools Test)
The operation was canceled.
|
chunks (1, Unit Test(1))
The job was canceled because "_4_Client_Integration_Tes" failed.
|
chunks (1, Unit Test(1))
The operation was canceled.
|