-
Notifications
You must be signed in to change notification settings - Fork 726
Pull requests: tikv/pd
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
resource control: fix unsafe usage of time.After and timer.Reset
approved
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8929
opened Dec 17, 2024 by
lhy1024
Loading…
resource control: fix unsafe usage of time.After and timer.Reset
approved
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8928
opened Dec 17, 2024 by
lhy1024
Loading…
Metrics: Go runtime metrics
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#8927
opened Dec 17, 2024 by
bufferflies
Loading…
pd-ctl: adjust output format for store-limit
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8924
opened Dec 17, 2024 by
lhy1024
Loading…
grafana: Add Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
gRPC Received commands rate
panel
dco-signoff: yes
#8921
opened Dec 16, 2024 by
okJiang
Loading…
keypath: remove rootPath from storage and change all paths to absolute path
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
region: fix the potential panic . (#7143)
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#8916
opened Dec 13, 2024 by
ti-chi-bot
Loading…
scheduler: consider leader score when evict leader
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8912
opened Dec 12, 2024 by
lhy1024
Loading…
*: unify the gRPC errors
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#8910
opened Dec 12, 2024 by
rleungx
Loading…
build(deps): bump golang.org/x/crypto from 0.23.0 to 0.31.0
dco-signoff: yes
Indicates the PR's author has signed the dco.
dependencies
Pull requests that update a dependency file
do-not-merge/needs-linked-issue
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#8904
opened Dec 12, 2024 by
dependabot
bot
Loading…
resource control: fix unsafe usage of timer.Reset (#8877)
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-7.1
This PR is cherry-picked to release-7.1 from a source PR.
#8901
opened Dec 11, 2024 by
ti-chi-bot
Loading…
config: disable witness related schedulers by default (#7765)
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
type/cherry-pick-for-release-7.1
This PR is cherry-picked to release-7.1 from a source PR.
#8893
opened Dec 11, 2024 by
ti-chi-bot
Loading…
scheduler: support changing batch for slow score scheduler
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8888
opened Dec 10, 2024 by
rleungx
Loading…
api: return not found when region doesn't exist
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8869
opened Dec 4, 2024 by
lhy1024
Loading…
[WIP] ci: bump github actions
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8862
opened Dec 2, 2024 by
wuhuizuo
Loading…
*: reset prepare checker once the cache is reset
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8860
opened Nov 28, 2024 by
rleungx
Loading…
syncer: exit watch leader immediately (#8824)
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
type/cherry-pick-for-release-6.1
This PR is cherry-picked to release-6.1 from a source PR.
#8834
opened Nov 20, 2024 by
ti-chi-bot
Loading…
syncer: exit watch leader immediately (#8824)
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
type/cherry-pick-for-release-5.4
This PR is cherry-picked to release-5.4 from a source PR.
#8832
opened Nov 20, 2024 by
ti-chi-bot
Loading…
syncer: exit watch leader immediately (#8824)
approved
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#8827
opened Nov 20, 2024 by
ti-chi-bot
Loading…
tso: make tso log more clear
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#8826
opened Nov 20, 2024 by
okJiang
Loading…
region: check if the query startkey and endkey specify an uncovered region
dco-signoff: yes
Indicates the PR's author has signed the dco.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8790
opened Nov 7, 2024 by
JackL9u
Loading…
*: remove api mode
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#8780
opened Nov 6, 2024 by
rleungx
Loading…
build(deps): bump github.com/golang-jwt/jwt/v4 from 4.4.2 to 4.5.1 in /tests/integrations
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
dependencies
Pull requests that update a dependency file
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#8771
opened Nov 4, 2024 by
dependabot
bot
Loading…
[DNM]: test ci on release-8.5
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#8761
opened Nov 1, 2024 by
purelind
Loading…
api: fix cannot dump trace (#7255)
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#8754
opened Oct 30, 2024 by
ti-chi-bot
Loading…
Previous Next
ProTip!
no:milestone will show everything without a milestone.